HVAC for government and public sector buildings

Public buildings carry long operating hours, strict specifications and public accountability. We plan and execute HVAC work against approved BOQs, drawings and technical requirements, with documented testing, commissioning and handover.
Sector
Government and public sector
Base
Gorakhpur, Uttar Pradesh
Scope
Design to AMC
Work type
Government and private
Large government auditorium with tiered seating and ceiling air distribution
Tender-led delivery for public infrastructure.

Tender-led delivery for public infrastructure.

Central and state government buildings, offices, hospitals, railway, defence and institutional campuses.

Spaces and building types

  • Central government buildings
  • State government buildings
  • Government offices and administrative buildings
  • Government hospitals and medical colleges
  • AIIMS and healthcare institutions
  • Railway stations and railway buildings
  • Railway offices and railway auditoriums
  • Airports and airport buildings
  • Air Force and defence establishments
  • Police headquarters and police buildings
  • Government universities and colleges
  • Government schools and educational institutions
  • Government sports complexes and stadiums
  • Government museums
  • Government convention centres
  • Public sector undertakings
  • Government residential buildings
  • Government laboratories
  • UPRNN and other government infrastructure projects

How the work is delivered.

The same sequence is applied to government projects, with the technical detail adapted to the building.

  1. 01

    Requirement and site review

    We review the building use, drawings, occupancy, available plant space and project timeline.

  2. 02

    Design and BOQ

    Heat load calculation, system selection, equipment schedule, BOQ and technical specifications are prepared.

  3. 03

    Supply and installation

    Approved equipment and materials are supplied and installed with coordinated site execution.

  4. 04

    Testing and commissioning

    Pressure testing, air balancing, control checks and performance verification are completed.

  5. 05

    Handover and support

    Documentation is handed over and maintenance or AMC support can continue after commissioning.

Images from this sector.

Photography from project sites and installed environments.

Large tiered auditorium with concealed ceiling air distribution
Auditorium air distributionTiered seating, high occupancy and concealed supply and return air paths.
IndianOil public sector office building with louvred facade
Public sector office buildingCorporate office building for a public sector undertaking.

Planning an HVAC scope for a government building?

Speak to Maksood Hussain and Mohammed Anas about the requirement, drawings or tender documents.

Maksood Hussain
Managing Director
88403 90617
Mohammed Anas
Manager
72390 59481
smartengineeringsolution9651@gmail.com
Gorakhnath office
Gorakhnath Mandir, Ansari Road, Gorakhnath, Gorakhpur, Uttar Pradesh 273015