HVAC for government and public sector projects.

Buildings in the public record.
Government work covers a wide range of building types, each with its own occupancy, safety and maintenance requirements.
- 09AZFPH0442M1ZB
- UDYAM-UP-32-0035759
- Proprietorship
- 2020
- Central government buildings
- State government buildings
- Government offices and administrative buildings
- Government hospitals and medical colleges
- AIIMS and healthcare institutions
- Railway stations and railway buildings
- Railway offices and railway auditoriums
- Airports and airport buildings
- Air Force and defence establishments
- Police headquarters and police buildings
- Government universities and colleges
- Government schools and educational institutions
- Government sports complexes and stadiums
- Government museums
- Government convention centres
- Public sector undertakings
- Government residential buildings
- Government laboratories
- UPRNN and other government infrastructure projects
Tender routes and execution.
We participate in government procurement through GeM and other applicable e-tendering platforms. The scope is executed as awarded, with clarifications handled before materials are ordered.
- 01
Requirement and site review
We review the building use, drawings, occupancy, available plant space and project timeline.
- 02
Design and BOQ
Heat load calculation, system selection, equipment schedule, BOQ and technical specifications are prepared.
- 03
Supply and installation
Approved equipment and materials are supplied and installed with coordinated site execution.
- 04
Testing and commissioning
Pressure testing, air balancing, control checks and performance verification are completed.
- 05
Handover and support
Documentation is handed over and maintenance or AMC support can continue after commissioning.
Documents we review
- Tender ID or GeM bid number
- Approved BOQ or item schedule
- Technical specifications
- Architectural and HVAC drawings
- Site address and access details
- Completion timeline
- Preferred equipment brands, if specified
Systems used in public buildings.
The system mix depends on the building use, plant space and maintenance arrangement.
All HVAC systemsVRF and VRV systems
Zoned comfort with a single refrigerant network.
Chiller plant systems
Central cooling for large and continuous loads.
AHU and ventilation
Conditioned air, moved and balanced.
Ducting and copper piping
The routes that decide system performance.
Ventilation and smoke control
Safe air paths for enclosed and occupied spaces.
Public building work in view.
A selection of government, healthcare and institutional environments from our project records.




Have a government tender to review?
Send the tender ID, BOQ and specifications. We will review the HVAC scope and confirm what can be executed.
